Documents
Documents
Here you will find relevant documents relating to the project, including community newsletters, public exhibition information and the Environmental Impact Assessment documents submitted to the planning authorities.
-
-
Chapter 2 - Figure 2.7a(1) - Indicative Access Junction Widening A(1) (A9)
Chapter 2 - Figure 2.7a(2) - Indicative Access Junction Widening A(2) (A9)
Chapter 2 - Figure 2.7b - Indicative Access Junction Widening B (B9152)
Chapter 2 - Figure 2.8 - Indicative Cross-Sections of Access Tracks
Chapter 2 - Figure 2.10 - Indicative Batching Plant Compound
Chapter 2 - Figure 2.11 - Indicative Substation Elevation Drawing
Chapter 2 - Figure 2.12 - Internal Make-Up of the Substation
Chapter 6 - Figure 6.2.1 - TA 6.2 - A6.2.1 - Aviation Lighting ZTV - Nacelle Lighting
Chapter 6 - Figure 6.2.2 - TA 6.2 - A6.2.2 - Aviation Lighting ZTV - Nacelle Lighting
Chapter 6 - Figure 6.2.3 - TA 6.2 - A6.2.3 - Aviation Lighting ZTV - Nacelle Lighting - 20km
Chapter 6 - Figure 6.2a - Blade Tip Height 200m - 230m ZTV and Visual Receptors at 45km
Chapter 6 - Figure 6.2b -Blade Tip Height 200m - 230m ZTV and Visual Receptors at 20km
Chapter 6 - Figure 6.3a - Hub Height 118.5m - 148.5m ZTV and Visual Receptors 45km
Chapter 6 - Figure 6.3b - Hub Height 118.5m - 148.5m ZTV and Visual Receptors - 20km
Chapter 6 - Figure 6.4c - Landscape Character Types with Blade Tip Height 200m - 230m ZTV 45 km
Chapter 6 - Figure 6.5a - Designated Landscapes and Wild Land Areas 45km
Chapter 6 - Figure 6.7a - Cumulative ZTV- South-West Group Scenario 1 45km
Chapter 6 - Figure 6.7b - Cumulative ZTV - South-west Group Scenario 2 45km
Chapter 6 - Figure 6.8 - Cumulative ZTV - Corriegarth Group Scenario 1 45km
Chapter 6 - Figure 6.9a - Cumulative ZTV - North-west Group Primary Assessment 45km
Chapter 6 - Figure 6.9b - Cumulative ZTV - North-west Group Scenario 3 45km
Chapter 6 - Figure 6.10a - Cumulative ZTV - North Group Primary Assessment 45km
Chapter 6 - Figure 6.10b - Cumulative ZTV - North Group Scenario 3 45km
Chapter 6 - Figure 6.11 - Cumulative ZTV - Clune Scenario 3 45km
Chapter 6 - Figure 6.12a - Cumulative ZTV - North-east Group Scenario 1 45km
Chapter 6 - Figure 6.12b - Cumulative ZTV - North-east Group Scenario 3 45km
Chapter 7 - Figure 7.1 - Year 1 Vantage Point Locations and Viewsheds and Survey Areas
Chapter 7 - Figure 7.2 - Year 2 Vantage Point Locations and Viewsheds and Survey Areas
Chapter 8 - Figure 8.1a - Nature Conservation Statutory Designations
Chapter 8 - Figure 8.1b - Nature Conservation Non-Statutory Designations
Chapter 8 - Figures 8.3a-d - UK Habitat Classification Survey Results
Chapter 8 - Figures 8.4a-d - National Vegetation Classification Survey Results
Chapter 8 - Figure 8.5a-d - Groundwater Dependent Terrestrial Ecosystems
Chapter 9 - Figure 9.9 - Private Water Supply Risk Assessment
Chapter 9 - Figure 9.10 - Ground Water Dependent Terrestrial Ecosystems
Chapter 10 - Figure 10.3 - Cultural Heritage Viewpoint 1 - Woodend cairn 760m northwest of Woodend
Chapter 10 - Figure 10.4 - Cultural Heritage Viewpoint 2 Inverlaidnan Old House
Chapter 11 - Figure 11.3 - Personal Injury Accidents (PIA) Plan
Chapter 11 - Figure 11.4 - Abnormal Indivisible Load Route Plan
-
Chapter 6 - Figures 6.13a-f - Viewpoint 1 - Carn Glas Choire
Chapter 6 - Figures 6.16a-f - Viewpoint 4 - Meall a’ Bhuchaille
Chapter 6 - Figures 6.21a-f - Viewpoint 9 - B790 near Loch Insh
Chapter 6 - Figures 6.22a-j - Viewpoint 10 - River Dulnain (southern bridge crossing)
Chapter 6 - Figures 6.25a-f - Viewpoint 13 - Carn na Saobhaidhe
Chapter 6 - Figures 6.27a-f - Viewpoint 15 - Beinn Bhreac Mhor
Chapter 6 - Figures 6.29a-f - Viewpoint 17 - A938 Carrbridge Achnahannet Junction
Chapter 6 - Figures 6.30a-f - Viewpoint 18 - Estate track near River Dulnain Allt an Tudair
-
Chapter 6 - Figures 7.4a-e - Viewpoint 4 - Meall a’ Bhuchaille
Chapter 6 - Figures 7.9a-d - Viewpoint 9 - B790 near Loch Insh
Chapter 6 - Figures 7.10a-d - Viewpoint 10 - River Dulnain (southern bridge crossing)
Chapter 6 - Figures 7.13a-d - Viewpoint 13 - Carn na Saobhaidhe
Chapter 6 - Figures 7.15a-d - Viewpoint 15 - Beinn Bhreac Mhor
Chapter 6 - Figures 7.17a-d - Viewpoint 17 - A938 Carrbridge Achnahannet Junction
-
-
Chapter 2 - Technical Appendix 2.1 - Outline Construction Environmental Management Plan
Chapter 2 - Technical Appendix 2.2 - Battery Safety Statement
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part A
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part B1
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part B2
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part B3
Chapter 4 - Technical Appendix 4.2 - Highland Wind Farm EIA Scoping Opinion
Chapter 4 - Technical Appendix 4.3 - Highland Wind Farm Gatecheck Report
Chapter 4 - Technical Appendix 4.4 - Highland Wind Farm EIA Further Consultation
Chapter 6 - Technical Appendix 6.2 - Aviation Lighting Assessment
Chapter 6 - Technical Appendix 6.3 - Wild Land Impact Assessment
Chapter 6 - Technical Appendix 6.4 - Assessment of Effects on Special Landscape Qualities of CNP
Chapter 7 - Technical Appendix 7.2 - Collision Risk Modelling
Chapter 8 - Technical Appendix 8.1 - National Vegetation Classification Habitat Survey Report_Part A
Chapter 8 - Technical Appendix 8.1 - National Vegetation Classification Habitat Survey Report_Part B
Chapter 8 - Technical Appendix 8.1 - National Vegetation Classification Habitat Survey Report_Part C
Chapter 8 - Technical Appendix 8.3 - Protected Species Survey Report
Chapter 8 - Technical Appendix 8.7 - Outline Peatland Restoration and Habitat Management Plan
Chapter 8 - Technical Appendix 8.8 - Shadow Habitat Regulations Assessment
Chapter 9 - Technical Appendix 9.1 - Watercourse Crossing Schedule
Chapter 9 - Technical Appendix 9.2 - Private Water Supply Risk Assessment
Chapter 9 - Technical Appendix 9.3 - Ground Water Dependent Terrestrial Ecosystem Risk Assessment
Chapter 9 - Technical Appendix 9.5 - Peat Landslide Hazard Risk Assessment_Part A
Chapter 9 - Technical Appendix 9.5 - Peat Landslide Hazard Risk Assessment_Part B
Chapter 9 - Technical Appendix 9.5 - Peat Landslide Hazard Risk Assessment_Part C
Chapter 9 - Technical Appendix 9.6 - Peatland Condition Assessment_Part A
Chapter 9 - Technical Appendix 9.6 - Peatland Condition Assessment_Part B
Chapter 10 - Technical Appendix 10.1 - Heritage Assets within the Inner Study Area
Chapter 10 - Technical Appendix 10.2 - Heritage Assets within the Outer Study Area
Chapter 12 - Technical Appendix 12.1 - Highland Wind Farm Noise Consultation
Chapter 14 - Technical Appendix 14.1 - Carbon Calculator Spreadsheet
-
Community Open Days - November 2024
Community Open Days - April 2024
Scoping Request - March 2024
Highland Wind Farm Scoping Report
Highland_WF_Scoping_Figure 1.2 - Proposed Development Scoping Layout
Highland WF_Scoping_Figure 3.1 - On Site Environmental Constraints
Highland WF_Scoping_Figure 3.2 - Environmental Constraints_10km
Highland_WF_Scoping_Figure 5.1a - Tip Height ZTV 10km and Proposed VPs
Highland_WF_Scoping_Figure 5.1b - Tip Height ZTV 45km and Proposed VPs
Highland_WF_Scoping_Figure 5.2a - Hub Height ZTV 10km and Proposed VPs
Highland_WF_Scoping_Figure 5.2b - Hub Height ZTV 45km and Proposed VPs
Highland_WF_Scoping_Figure 5.4 - Landscape Designations, Wild Land and Tip Height ZTV
Highland_WF_Scoping_Figure 5.6 - Viewpoint 2 A938 Carrbridge Wireline
Highland_WF_Scoping_Figure 5.7 - Viewpoint 5 Cairngorm (Funicular Railway) Wireline
Highland_WF_Scoping_Figure 5.8 - Viewpoint 11 Carn Sgulain Wireline
Highland_WF_Scoping_Figure 5.9 - Viewpoint 14 Strathdearn Wireline
Highland WF_Scoping_Figure 6.1 - Ecology & Ornithology Constraints
Highland WF_Scoping_Figure 8.1 - Site Location and Study Area
Highland WF_Scoping_Figure 9.1a - Cultural Heritage Proposed Development Site - Turbine Area
Highland WF_Scoping_Figure 9.1b - Cultural Heritage Proposed Development Site - Access Area